The compliance review your certifier needs, faster.
Upload the project's BCA, NatHERS, BASIX, plans and specs. ClauseLogic extracts the structured data, runs NCC 2022 and AS compliance checks, and produces the paperwork your certifier needs.
Free 14-day trial·No credit card·Australian-owned & hosted
FROM THE SAMPLE PROJECT · 31 BROOKS STREET, CLASS 1A
in one upload, split automatically
extracted, scored and cited
NCC 2022 plus five AS references
caught before the certifier saw it
THE PROBLEM
A compliance review is mostly reading, retyping and cross-checking.
The judgement is the job. The hours go somewhere else: eight documents that each hold a piece of the answer, and no reliable way to tell when two of them disagree until someone downstream finds out.
Open eight PDFs side by side and read the R-values out of the spec by eye.
Retype the NatHERS and BASIX figures into a review template.
Chase which document is current when the spec and the certificate disagree.
Find out at certifier review that one number was transcribed wrong.
Drop the whole bundle in. Combined PDFs split into sub-documents on their own.
Every value is extracted, classified, and cited back to the page it came from.
Disagreements between documents are flagged as conflicts before you sign anything.
The report is composed from the values you confirmed, not retyped from them.
HOW IT WORKS
Three steps from documents to deliverable.
Every extracted value carries a confidence score and a page-level citation back to its source document.
- 01
Upload the project documents
BCA report, NatHERS certificate, BASIX certificate, architectural plans, specifications. Drop them in, or send the client a project portal link. Combined PDF bundles split into sub-documents automatically.
- 02
The platform extracts structured data
Every value gets auto-classified with a confidence score and a page-level citation back to its source. Review what the platform got right; correct what it didn't. Conflicts between documents are flagged for you to resolve.
- 03
Generate the paperwork your certifier needs
Compliance reports, NatHERS assessor summaries, BASIX prefill sheets, produced from the extracted data, priced in credits, ready for review and lodgement.
INSIDE A PROJECT
Every number, with the page it came from.
This is the Data tab on a live project. Six of thirty-four extracted values, each classified, scored and linked back to its source document.
01
Confidence on every value
A band, not a guess. Anything the model is unsure of surfaces for review instead of flowing silently into a deliverable.
02
Page-level citation
Click a value and land on the page of the source PDF it was read from. Nothing in a report is unattributable.
03
Cross-document conflicts
When the specification says R2.8 and the NatHERS certificate assumes R2.5, you see it here, before the certifier does.
What ClauseLogic produces today
An honest list of what's built, with more on the way. Each output is priced in credits and tagged by processing layer.
- L4
Compliance Review Report
Class 1a residential, runs the full NCC 2022 rule pack and composes the review your certifier needs.
NCC 2022AS 3740 - L2
NatHERS Assessor Summary
Thermal envelope comparison, declared vs specified R-values, U-value and SHGC.
NatHERSR-value - L2
BASIX Input Prefill
DOCX prefilled from the BASIX certificate and specs. NSW residential.
BASIXNSW - L3
Tender Risk Register
13 cross-document fire risk checks for Class 5 commercial office tender response.
Class 5private beta
CLAUSE GUIDANCE
The clause that governs it, and the number that's easy to get wrong.
Look up a real situation on site, a balcony door threshold, a parapet capping, a curtain-wall test, and get the governing NCC + AS clause, the plain-language requirement, and the products that satisfy it.
Browse clause guidance →External above-ground membrane with a vertical termination up the wall to the nominated height, around the whole perimeter.
Terminate the membrane to the minimum height the wind-load report nominates, hob, set-down or trench drain at the door.
Site water-penetration test regime for the façade system, tied back to the NCC weatherproofing performance requirement.
Start managing projects and running compliance checks.
14-day free trial. No credit card required. We'll email you a sign-up link. Class 1a residential available today; commercial fire (Class 5 office) in private beta.
Request an account
Privacy Act 1988 compliant · Australian-hosted
